EDF Energy
EDF EnergyOffice design and fit out Office design and fit out in London for Powerlink, a 25000 sq ft head office for a division of EDF, located in Southwark SE1. The London office design and fit-out project involved a fast-track design and build approach to get Powerlink relocated from offices in Waterloo and Victoria. Following an...
Wellcome Trust
Wellcome TrustReception Desk Alterations and the manufacture and installation of a new science gallery reception desk. An existing Head office corporate reception desk was comprehensively re-built and adapted, and a new gallery reception desk with matching security check-in desk were supplied. Office reception design services included a full ergonomic and workplace design assessment. Ergonomic Alteration to Existing...
Allianz Global Assistance
Allianz Global AssistanceReception Area Refurbishment A design and build project for a Reception area refurbishment for the unveiling of a new corporate identity. Works were completed to ensure the opening of the refurbished reception coincided with the release of the new company name and branding. Completion of the reception design was achieved just days before...
Government Agency Office Interior
London Office RefurbishmentGovernment Agency Office Interior Office design and fit out for a London representative office in St James SW1. This central London office provides a base for visiting staff and for a permanent team based in London. This London office interior design is a mix of workspace, meeting areas and flexible event space. The use of strong...